top of page

Norfolk General Hospital Chiller Replacement

As part of my summer 2022 internship with Victaulic, I went on-site to Norfolk General Hospital to get measurements for the existing building to install new chillers and pumps. I routed pipes and designed piping layouts for the upgraded mechanical room after demolition of the current one. Additionally, I modelled mechanical equipment (pumps, strainers etc.) based on submittals to be used within the 3D Revit model. 

bottom of page